How to Setup automatic back-up in SAGE 50

For the programmed reinforcements to run, the accompanying circumstances should be all TRUE:

 On the PC where the information is put away, the programmed arrangement should be set up.

 At the time the reinforcement is booked to play out, that PC should be turned on.

Sage 50 Company can't be in dynamic use.

The reinforcement won't be made on the off chance that the above conditions are not met. On the off chance that the first measures are all met, continue with the arrangement underneath:

Stage 1

Click File, Automatic Backup while Sage 50 is open. You may likewise get to the Automatic Backup Configuration from the outset menu or the work area symbol.

Read More-:How to Pay 1099 Vendors

Stage 2

Select the organization registry by clicking Browse close to the Company index.

Stage 3

Select the objective envelope for the reinforcement documents by clicking Browse next to Save Backup to.

Stage 4

Assuming the organization has clients set up:

  • Enter the Sage 50 client name
  • Enter the Password
  • Affirm the secret key
  • Click Verify User Details

Stage 5

Under Include, if accessible: whenever wanted:

  • Check Company name in the reinforcement record name (suggested if utilizing more than 1 Sage 50 organization)
  • Really look at Archived organizations
  • Actually take a look at Attachments (suggested if connecting documents, like PDFs or pictures, to exchanges or support records)

Stage 6

On the off chance that a reinforcement document as of now exists, select the ideal reinforcement choice. Naturally making another reinforcement document is energetically suggested.

Assume a reinforcement document with a similar name as of now exists in the reinforcement area when the robotized reinforcement is run. All things considered, this choice will create another reinforcement document.

Read More-: Sage 100 mas 90 200 federal and state e filing and report

Stage 7

You need to look at Log clients prior to running reinforcement (suggested yet not needed)

Stage 8

Click Save

Stage 9

You can pick a save area and a File Name for the design record. The organization index is suggested

Stage 10

Click Save

Stage 11

Click Schedule

 Stage 12

Pick the reinforcement plan you need (week by week reinforcements are suggested)

Stage 13

Click OK

Stage 14

When provoked for a secret phrase, type the Windows account secret word and snap OK.

Note: For admittance to the Windows Task Scheduler, the Windows client account should have a secret phrase designed. The errand can't be planned on the off chance that the client account doesn't need a secret key to sign in.

Stage 15

Click Save

Sage 50 needn't bother with to be open for the programmed reinforcements to work really, however Windows should be signed in on the PC that made the reinforcement design document. In this way, these methods ought to be performed at the server.

Assuming any clients are endorsed into the Sage 50 Company at the planned reinforcement time and the choice to Log out clients before running reinforcement isn't empowered, the reinforcement won't work.

See also-: Sage Error Code 3101

It is exhorted that reinforcements be saved to a particular reinforcement envelope and that this envelope be reared up to an off-site area or outside drive routinely to keep away from information misfortune in case of equipment disappointment.

 Peruse to the envelope where the reinforcement setup record (.PTC) was saved, and open the .txt document with a similar name to see the log of programmed reinforcements.